The Lakehaven Utility District (District) has completed a
Water Reclamation Feasibility Study and a Environmental Impact Statement (EIS)
for a Reclaimed Water System Project. The EIS includes both a general
“programmatic” overview of potential future reclaimed water strategies in
the District, as well as “project-specific” facility configuration
alternatives that address specific treatment plant upgrades, conveyance
routes, and recharge sites for reclaimed water. The EIS has been prepared
consistent with the Washington State Environmental Policy Act (SEPA)
(Chapter 43.21C RCW) and SEPA Rules (Chapter 197-11 WAC). For more
information contract John Bowman (jbowman@lakehaven.org).
The following
documents are in Adobe Acrobat format. If you do not have
Acrobat Reader you can get it free
here.
These are very large files - please be patient while they load.
Environmental Impact Statement (4.3 mb)
Water Reclamation
Feasibility Study (23.8 mb) |