This Comprehensive Wastewater System Plan is a summary of the conclusions
and findings completed by Penhallegon Associates Consulting Engineers, Inc.
and Brown and Caldwell, Inc. in analyzing Lakehaven Utility District's
existing wastewater collection and treatment systems. The Plan updates and
supercedes the District's previous (1983) Comprehensive Sewer Plan and has
been prepared in accordance with all applicable regulatory requirements. The
primary goals of the planning effort were to:
- Determine the adequacy of the existing wastewater collection and
treatment system to meet the current and projected needs of the
District's customers in accordance with all state, federal and local
regulations, as well as current industry standards.
- Develop recommendations for system improvements which meet the
wastewater collection and treatment system needs, are environmentally
sound and protect public health and welfare.
- Identify potential mechanisms for funding recommended studies,
improvements and other recommendations of the Plan.
The following is a summary of the key elements of the planning process
and sections of the Plan:
Introduction
This section presents an overview of the study, history and objectives of
the District, and a summary of the rules and regulations which govern the
operation of the District and the development of the Comprehensive Planning
Document.
Basic Planning Data
Lakehaven Utility District currently serves within the corporate limits
of eight jurisdictions. The future service area identified in the Plan
extends to the District's corporate boundary, which represents a significant
change from the previous Comprehensive Plan. This change is the result of
Growth Management Act planning, which eliminates the previous restriction
associated with Local Service Area designations and establishes an Urban
Growth Area (UGA) within which urban levels of service are to be provided.
The entire corporate boundary of the District is within the UGA and the
District is therefore responsible for planning accordingly.
Demographics
Population and employment forecasts are based on the adopted land use
plans of the various jurisdictions within which the District operates. They
are presented by drainage basin to allow for evaluation of the system and
consideration of future improvement alternatives. As of 1997, there were
approximately 109,000 residents and 37,000 employees within the District's
corporate boundary. The population is projected to increase to nearly
121,000 by 2003, and almost 150,000 by the year 2017. Employment is expected
to increase to more than 42,000 by 2003 and more than 52,000 by 2017. An
estimated 7,500 on-site wastewater disposal systems are in operation within
the corporate area. It is anticipated that service will be extended to these
unsewered areas as on-site systems become less viable to maintain and/or new
development requires public sewers.
Flow Projections
Average daily flow from the District, is currently (1997) estimated at 11
MGD and is expected to increase to nearly 13 MGD by 2007, 15 MGD by 2017,
and nearly 25 MGD at full development. Peak flows, including infiltration
and inflow (I & I), are estimated at 21 MGD in 1997, 33 MGD by 2007, 35
MGD by 2017, and 48 MGD at full development.
Existing Wastewater Collection System
The existing collection system consists of approximately 275 miles of
sanitary sewer pipes, 6,500 manholes, 27 pump stations, six siphons and two
secondary wastewater treatment facilities. The system has been constructed
over a number of years, and from a wide variety of materials, as dictated by
development trends in the area. The system is divided into seven primary
basins and 40 smaller sub-basins. The two largest basins, Lakota and
Redondo, flow to the District's wastewater treatment plants. The remaining
basins currently discharge to other utilities for treatment and disposal.
Collection System Analysis/Recommended Improvements
Analysis of the collection system was accomplished with a computer
modeling system using the design criteria established in the Plan. Primary
issues resulting from analysis of the collection system were related to
normal renewal and replacement programs, I & I control in the older
areas of the system (especially Redondo), capacity issues related to growth
and the reconfiguration of drainage basins to maximize capacity in the
existing treatment facilities and minimize pump station requirements.
Collection system improvement projects identified in the Capital Facilities
Plan are representative of these findings, as well as extension of service
to currently unsewered areas.
Treatment Facilities Analysis
The Lakota Plant was constructed as a primary treatment plant in 1967 and
upgraded to secondary treatment in 1991. The Lakota plant was designed for a
peak month flow of 10 mgd and a peak hour flow of 22.2 mgd. The Redondo
plant was constructed as a primary treatment plant in 1962 and upgraded to
secondary treatment in 1983. The Redondo plant was designed for an annual
average flow of 4.32 mgd and a peak hour flow of 13.8 mgd.
Hydraulic Capacity Analysis
Analyses were performed using 1992-1997 data during which period annual
wastewater flow to Lakota increased 10% to 4.12 mgd and to Redondo
increased 25% to 3.0 mgd. Peak hour flows for 1997 were 11.3 at Lakota,
11.2 at Redondo (the latter was estimated due to flowmeter limit).
Hydraulic capacity at both plants is estimated to be available up to the
original design peak hour capacities of 22.2 mgd for Lakota and 13.8 mgd
for Redondo.
Lakota Process Capacity Analysis
Analyses were performed on 1992-1997 data and individual process unit
capacities were compared to Washington State design criteria. Limiting
criterion at Lakota is peak month capacity. Primary treatment comprises
screening, grit removal and primary clarifiers and has adequate capacity.
Grit and primary scum removal need improvement to protect and optimize
downstream processes. Secondary treatment comprises aeration basins,
secondary clarifiers and chlorine disinfection. Process analysis showed
peak month capacity at 9.2 mgd for the aeration process (limited by air
diffusion capacity) and 10.5 mgd for the secondary clarifier process vs.
the overall design capacity of 10 mgd. The estimated dry weather capacity
is 7.2 mgd and is limited by air diffuser capacity. Solids treatment
comprises thickening, digestion and dewatering and has adequate capacity.
Of the three solids processes, digestion has the least reserve capacity at
20 percent. The overall process design capacity of 10 mgd can, in
practice, be achieved by higher capacity processes compensating for lower
capacity processes
Redondo Process Capacity Analysis
Analyses were performed on 1992-1997 data and individual process unit
capacities were compared to Washington State design criteria. Limiting
criteria at Redondo is peak hour capacity. Primary treatment comprises
screening, grit removal and primary clarifiers and has adequate capacity.
Grit removal needs improvement to protect and optimize downstream
processes. Manual screenings removal is labor intensive and could be
automated. Secondary treatment comprises aerating trickling filters,
secondary clarifiers and chlorine disinfection. Secondary capacity, and
consequently overall process capacity, is limited by clarifier capacity.
However, clarifier capacity can be partially compensated for in other
processes. Solids treatment comprising digestion and dewatering has
adequate capacity. Limited thickening is achieved in the process tanks
rather than a separate thickening process.
Recommended Treatment Facility Improvements
The recommended improvements fall into two categories, general
improvement requirements and capacity expansion requirements. General
improvement are those needed to improve individual processes and provide
improved control of the plants. Capacity improvements are those needed to
accommodate future wastewater flows.
Biosolids
Dewatered biosolids cake from both plants, stabilized to Class B
quality in the digesters, is trucked to compost producers. Metals content
in the biosolids has been consistently well below EPA regulatory limits
for land application and is currently below EPA limits for
"clean" biosolids.
Water Reuse
The District is evaluating the feasibility of municipal wastewater reuse
to offset potable water use. The November 1998 Comprehensive Water System
Plan by Kennedy/Jenks Consultants, provided an evaluation of the feasibility
of wastewater reuse. Landscape irrigation and groundwater recharge are the
two potential reclaimed water uses identified within the District. However,
because of the potential cost and regulatory uncertainties, at this time
water reuse possibilities are limited. Future reclamation treatment
facilities would be located at the Lakota WWTP and possibly the Redondo WWTP,
if implemented.
Financing Options
Several typical funding options are available to the Lakehaven Utility
District. These include the following: State and Federal Grants and Loans;
Bond Financing, both General Obligation Bonds and Revenue Bonds;
Privatization; Leasing; Pay-As-You-Go; Capital Reserve Funds; Development
Based Funding; and Connection Fees.
An appropriate funding mix is needed by the District to finance the
proposed capital improvements. The District should continue to aggressively
pursue government loan funding and build reserve funds to finance scheduled
system repairs and upgrades. The District should continue to evaluate the
benefit of inter-local contracts with Agencies who may share in the cost of
the improvements. A rate study is recommended as a follow-up to this Plan.